Dry Lab
Goals
-
Create a layman's version of the project from a synthetic biology perspective for dry lab members.
-
Design all dry lab projects to have a clear and meaningful integration to another sub team.
-
Have a constant feedback loop with wet lab team.
-
Engage in outreach events with human practices.
Timeline
Event | Start Date | End Date |
---|---|---|
Project pitch brainstorming (✔️) | January | February |
Assessment of all dry lab team members to projects (✔️) | February | March |
Start thinking of potential dry lab projects (✔️) | February | April |
Search for resources, advisors, etc (Leads initially, later whole team) | March | |
Assign self learning tasks (Leads) | March | |
Finalize dry lab projects (Make sure connection to wet lab is clear) | March | April |
Individual projects begin | April | August |
Project check-in #1 | April | |
Wiki Writing (GitLab Repo is provisioned) | June | September |
Project check-in #2 | June | |
Project check-in #3 | July | |
Project check-in #4 | August | |
Jamboree Preparation | September | October |
iGEM Medal Requirements
Bronze
-
Contributions Page
- Committing work to GitHub
- Documenting work relating to hardware
Silver
-
Engineering Success
-
Go through at least one iteration of the engineering design cycle:
- Hardware: Design → Build → Test → Learn
- Software: Design → Build → Test → Learn
- Modelling: Design → Build → Test → Learn
-
Go through at least one iteration of the engineering design cycle:
- Human Practices
Gold
- Wiki Writing
-
Special Award Nomination
- Best Software Tool
- Best Hardware
- Best Model